Delancey Lane Residential Housing

Groundworks, Foundations, Blockwork & Drainage for the Development of 4 new Residential Dwellings, Delancey Lane

  • Demolition Works to remove 8 Nr. Existing Chalet Units & Garage
  • 124 linear metres of Foundations
  • 152m2 200mm thick C35N Concrete Slab
  • 415m2 of Cavity Concrete Blockwork
  • 102 linear metres of Foul & Surface Water Drainage carried out incl. 2 Nr. Soakaways

Additional Info

  • Client: Riverside Point (Gsy) Ltd
  • Duration: 4 months